Innofreight Solutions premiere with US Steel Košice

On the 16th of January 2019, Innofreight unloaded the first train with 15 InnoWaggons equipped with 90 MonTainer XM. The 20 t heavy containers were loaded with lump iron ore (grain size 0-30 mm) in the port of Świnoujście (POL) and unloaded at US Steel Košice (SVK) with a Kalmar DCF 370 forklift into the freestanding hopper with height of 3.850 mm.

According to Innofreight Solutions the unloading takes 3 minutes per container. The loaded iron ore falls out and the small frozen residues in the corners and walls can easily be shaken off. The result is a completely empty container.

www.innofreight.com

 

Ähnliche Beiträge